The 100 years old Fournier footbridge is now being demolished and replaced by a new structure. The new footbridge spans the 120m wide rail tracks using one intermediate support in between the tracks. 2 bow-strings, 60m span each, allow pedestrian and bicycle traffic.

The challenge was to design a structure as light as possible to allow for ground prefabrication and equipement: the whole installation had to take place during only 3 night-time four-hours-long interventions.

images

données

  • City : Tours
  • Client : Tours plus
  • Surface area : 250 m²
  • Budget : 5 M€
  • Team : Elioth, B+M architectes, Viry, GTM, ADS
  • Services : Etudes et suivi de chantier