Cities : Bondy, noisy, Bobigny Team :BIG, Silvio D’Ascia, Egis Bâtiments, Elioth Date : 2017
All Elioth’s areas of expertise are put into practice on the Pont de Bondy project, one of the iconic stations of the new line 15 of the Grand Paris Express project. We are in charge of the structural design, building facades and envelopes, as well as strategies and environmental engineering. The station connects the 3 towns of Bondy, Noisy and Bobigny, via a pedestrian bridge over the Ourcq canal and an underground path under the existing tracks. The architectural design visibly links these elements to the central station building in a spiral path around the main hall.
The facades and roofs are entirely copper-clad. The panels are perforated when combined with a glass façade to create a double skin façade. The deck level is connected at floor level by a helical ramp that revolves around a central void. The transparent ETFE roof allows natural light to reach the subway level 35 meters below.
Elioth’s environmental strategies revolve around 3 main areas: Reduce, Reuse and Recycle, while ensuring passive cooling and control of natural lighting and lighting environments.
Find out more from…
Marion MARTY-MAHE
responsable façades.
Guillaume MEUNIER
directeur délégué
Loading...
Loading...
Nous utilisons des cookies pour vous garantir la meilleure expérience sur notre site web. Si vous continuez à utiliser ce site, nous supposerons que vous en êtes satisfait.OkNonPolitique de confidentialité